Feasibility Study · Hydrology & Sediment
02 / Services
Field measurements that ground a hydropower design in real river data: discharge, water levels and sediment.
01 / Scope
Direct measurement of river flow and continuous water-level records. On recent assignments each study included 6 direct discharge measurements.
02 / Scope
Daily sampling over a 30-day period on recent assignments, followed by laboratory testing.
03 / Projects
Projects where this work has been delivered.
Feasibility Study · Hydrology & Sediment
Feasibility Study · Hydrology & Sediment
Feasibility Study · Hydrology & Sediment
Project Identification · Feasibility Study · Hydrology & Sediment
04 / Gallery
Have a hydropower or infrastructure project in mind? Reach out and our team will get back to you within one business day.